For this primary bathroom, we switched up the floor plan
and replaced absolutely everything-surfaces, cabinets,
paint, lighting, blinds, hardware, plumbing fixtures and
accessories. The best part had to be relocating the
shower and allowing it to be filled with beautiful natural
light.